KTA 3902 PDF

KTA KTA Page 4 Comments by the editor: Taking into account. Buy KTA Design Of Lifting Equipment In Nuclear Power Plants from SAI Global. and Transportation Equipment for Heavy Loads, Radioactive Waste and Materials in Accordance with German Nuclear Standards KTA , and

Author: Kishakar Arashigul
Country: Argentina
Language: English (Spanish)
Genre: Literature
Published (Last): 23 December 2004
Pages: 149
PDF File Size: 10.90 Mb
ePub File Size: 5.73 Mb
ISBN: 788-8-55007-510-9
Downloads: 70637
Price: Free* [*Free Regsitration Required]
Uploader: Disida

Accidents occur faster than the reaction time of human beings Parallel systems, where the supervisory PLC is connected beside the Flux Vector Drive PES are superior ota serial systems, which are not single-failure proof. ASME has published a number of rules for the construction of gantry cranes and other hoists.

The aim is to help NPP crane operators to implement better safety procedures. An extensive modernisation project has ktx carried out in the last few years. We are looking for several development-oriented professionals to join our remarkable and unique project.

Therefore it is important to make inspections in the right sections of the wire. Kjell Andersson and Walter Ktaa presented a number of analysed crane problems in Sweden. The inbuilt torque limiter acts as an absolute protection against two-blocking and load hang-up. Small plastic bottles were filled and brought back home as a very exotic souvenir and as a symbol for a very special event, the first ever international seminar of KIKA.

The crane operation takes place either via cabin control or remote control. Parallel closed wire ropes are used in many nuclear facilities. Primary hazard should be eliminated by design. Lowering and even lifting is permitted in the 390 of electrical or mechanical failure in the hoist. The e-control plant is accommodated in a passable air-conditioned bridge girder or in the front beam.

Internal wire breaks are a problem. In his presentation Claude Auffret focused on the disc brake systems designed and manufactured by Stromag for nuclear industry customers. Secondly one should utilise passive safeguards. He also referred to a similar network in another country, but that network was reactively created following a big disaster. The e-control kra is located either on the trolley itself or in an e-container at the bottom between the 39002 legs on the reactor side.

  BATMAN #498 PDF

All these features lie outside the crane standards.

ktadesign-of-lifting-equipment-in-nuclear

You work in Mechanical Engineering team. The Type I equipment under ASME NOG gantry cranes, top running lifting equipment covers mechanical single-failure-proof design requirements and the lifting equipment is able to chain a load during an earthquake. The resulting document meets broad requirements that can be enforced contractually. The rest of the evening is history and can best be recalled by looking at the photos….

English-German Dictionary

Replacement of trolleys instead of modernisation. The group was guided through the laboratory and the welding process of the copper canisters was displayed in detail. About Industries Our know how News Contact.

Join a dynamic group! Michel Bunnik, Sales Manager of Global Projects, has seen a number of demanding lifting and transport projects.

KIKA Nuclear Cranes Seminar in Växjö– Summary – Kika Cranes Seminar

Planning of the work stages was a problem until an animated 3D model was developed, which helped to verify all critical points and measures. Advanced electromagnetic instruments can help inspectors to monitor large sections. The problem is that the core will break before the outer strands due to the design. Corrosion is another problem that can be solved by using galvanized wires or by relubricating the rope wires.

Mammoet from Holland is one of the legendary names of heavy lifting worldwide. You coordinate activities with the supplier and sub-suppliers, Fennovoima inter-discipline colleagues and Safety Authorities during all phases of the project. The animation could be used for timing at correct speed. The new safety device contains an endless screw rotated by the 39902 and controlled by the signals delivered by the hoist motor.

  GLORIA VICTIS TRESC PDF

For all of you who were not able to attend the seminar, we have compiled a brief summary of the lectures and speeches. Some of the most impressive units are containerized to allow fast transport anywhere in of the world. A total of 12 cranes have been renovated or changed since Ktx brakes and double steel wire ropes have been installed.

Other important features are overspeed detection and emergency stop.

Reactor Building Cranes

If you have ability to foresee risks and ensure precautions, problem solving attitude and interaction, team work attitude with ability to also listen, appreciate and adopt other perspectives, you can be a jta candidate for our team.

Steel wire ,ta are multiple redundant load-bearing elements — as parallel arrangement of load-bearing elements they can withstand a number of single element breaks and still not be discarded. Mechanical Engineer, Piping Fennovoima Julkaistu The top trolley with redundant safety hoists in accordance with KTA The company has a lot of experience of detecting and correcting misalignment and on-site services.

Crane and Lifting Equipment Engineer Mechanical As a Crane and Lifting Equipment Engineer you are responsible for implementing the technical requirements and analyses of cranes and lifting equipment.

In the case of abnormal speed or operation the main drive brake is automatically applied. The report contains an analysis of incidents concerning material handling equipment in the nuclear industry from